Abstract

On the production floor at Cahaya Bintang Mas Company Surabaya, the arrangement of production facilities is not optimal because the material handling distance is quite far. One effort to overcome the problems that occur, then do the redesign of the facility layout that occurs on the production floor using the Systematic Layout Planning Method. The research was conducted in December 2018 until the research was completed. The data needed in this research are primary data obtained through measurement methods and secondary data obtained through data that has been researched and collected by other related parties.The results showed that the total distance of material handling distance for the current layout has a total distance of 508.6 m, By SLP method it can reduce matherial handilg distance, alternative 1 layout has a total distance of 324.8 meter (36,1%), and alternative layout 2 has a total distance of 215.5 meter(57,6

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call