Abstract

Since North American Electric Reliability Council (NERC) issued the new control performance standard (CPS) in 1997, this standard has become the major paradigm of operating principle for load frequency control among the interconnection systems in North America. Based on the interconnected structure, NERC's CPS is to define the permissible distribution of areas' frequency deviations, and to limit areas' unscheduled tie-flows within an interconnection. As far as the whole power system is concerned, CPS is meant to monitor long-term performance of frequency controls. It naturally allows short term control relaxation from the control point of view. Accordingly, two operational concepts are proposed in this paper to achieve the objectives of both unit maneuvering relaxation and CPS quality. Using multi-objective optimization algorithm, the proposed concepts are successfully implemented and verified in the simulation cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.