Abstract

Hydroelectric power plant is one of the power plants that uses renewable energy sources with a low cost of production, in addition to providing a large enough profit for PLN, it can also be a source of revenue to cover production costs in meeting the system needs, so that the hydropower continues to operate optimally, Currently the Tanggari Hydroelectric Power Plant's special operating pattern can be approved not yet maximally based on the number of maintenance hours reaching 3-5 hours / month, this causes potential losses because most jam hours are carried out during the rainy season Turbine bearing temperature conditions continue to increase considering the poor air conditions associated special problem for hydropower. In this journal the author brings one of the breakthrough ideas to overcome this by implementing the Redesign of the Hydro Turbine Cooling System Installation to facilitate backwashing so that it can change maintenance patterns from offline to online. Implementation results can provide benefits because hydropower no longer needs to perform maintenance on the cooling system with offline mode so that hydropower can operate more optimally.

Highlights

  • ABSTRAK PLTA merupakan salah satu pembangkit listrik yang menggunakan sumber energi terbarukan dengan biaya pokok produksi yang rendah, selain memberikan keuntungan cukup besar bagi PLN juga bisa menjadi salah satu sumber pendapatan untuk menutup biaya produksi pembangkit lain yang masih menggunakan BBM dalam membangkitkan listrik, mengingat pentingnya peran PLTA dalam memenuhi kebutuhan system maka perlu menjaga agar PLTA tetap beroperasi dengan maksimal, saat ini pola operasi khususnya unit PLTA Tanggari bisa dikatakan belum maksimal dikarenakan jumlah jam pemeliharaan mencapai 3-5 jam/bulan, ini menyebabkan potensi kerugian karena sebagian besar jam pemeliharaan dilakukan saat musim hujan

  • it can also be a source of revenue to cover production costs in meeting the system needs

  • of the breakthrough ideas to overcome this by implementing the Redesign of the Hydro Turbine Cooling System Installation to facilitate backwashing so

Read more

Summary

PENDAHULUAN

Indonesia memiliki potensi tenaga air yang tersebar diseluruh daerah ± 75.000 MW.[1]. Sementara itu untuk membersihkan sistem pendingin pada turbine bearing cukup rumit karena apabila akan dilakukan pembersihan pendingin tidak dapat dikeluarkan dari tangki turbine bearing. Alternatif lainnya adalah pembersihan dengan metoda backwash namun kondisi saat ini tidak terpasang fasilitas untuk backwash sehingga pelaksanaan pemeliharaan harus menunggu unit shutdown. Setelah dilakukan analisa terkait masalah yang ada, maka didapatlah masalah utamanya yaitu fungsi pendingin yang tidak berfungsi dengan baik dikarenakan endapan lumpur yang masuk pada jalur pipa pendingin, untuk mengatasi umpur yang masuk pada pia pendingin maka dilakuakan pembersihan pada pipa pendingin (backwash) tanpa melakukan shutdown pada mesin pembangkit. Untuk perencanaan pipa clearing secara online bias dilihat pada gambar 1

HASIL DAN PEMBAHASAN
Terjadi penurunan suhu pada Bearing Turbine
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.