Abstract

Considering the characteristics of high-speed railway settlement requirement, i.e. high precision and strict control after construction, the subgrade settlement of the Wuhan-Guangzhou high-speed rail on the red clay area is calculated by ES method, e-lgp method, triaxial stress method, secant modulus method and field test method. In this essay, the accuracy of various calculation methods has been compared and corrected with the values from loading test. In this process, correction coefficients for various calculation methods have been obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.