Abstract
Summary This paper describes a single-well pilot in which light-oil diluent was injected through tubing to lower in-situ oil viscosity and increase production from a low-gravity oil well. The pilot well is located on the Heritage platform in the Santa Ynez Unit and produces from the Monterey formation. The pilot validated laboratory data suggesting that large production-rate increases could result from high-rate diluent injection.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.