Abstract

This project entitled “Recoverable quantity of waste heat at Messebo cement factor y” has tried to quantify the amount of heat loss, the amount of energy and cost saved from the waste heat. Here both primary and secondary data collection methods were included to carry out the study. So, the projects present starts by identifying the main source of waste (which part of cement have high loss), following calculated heat lost from the identified places or machines and final calculating the possible money saved if the waste heat changed to use full form or if it recovered Successful recovery waste heat contributes to lower fuel cost, lower electricity consumption. Kiln surface zones, Preheater cyclone 4 and 5 are the main areas in which high waste was occur. From Kiln surface zones (959.13 kJ), Preheater cyclone 4 and 5(587.199 kJ) amount of heat is lost. From this lost we can recover around 62 kW power is recovered, 44155kwhr/month energy and 26492birr/month could be saved. It recommended the energy management department should invite and support others participation and to study on the heat recovery from the loosing of energy and to study on the alternative energy sources of the company. Keywords: Waste heat, waste heat recovery system, Preheater, Kiln, energy, DOI : 10.7176/JETP/9-9-03 Publication date: December 31 st 2019

Highlights

  • There are more than 10 cements factories in Ethiopia.Mesebo cement factory is among the largest and former plants which provides cement for the African largest dam which is known as great Ethiopian renaissance dam which has the capacity to produce 6050 mega Watt

  • Description of the study area Messebo Cement Factory Private Limited Company (MCF PLC) is one of EFFORT (Endowment Fund for the Rehabilitation of Tigray) group companies established in accordance with the commercial code of Ethiopia

  • The clinker Calcination process is the most energy consuming in cement production, because of the exit gases from the clinker cooler and pre-heater and from the kiln surface

Read more

Summary

Introduction

There are more than 10 cements factories in Ethiopia.Mesebo cement factory is among the largest and former plants which provides cement for the African largest dam which is known as great Ethiopian renaissance dam which has the capacity to produce 6050 mega Watt. In the country majority of cement factories their main source of power is electricity from of utility grid and imported fossil fuels like coal. They consume a lot of powers to perform their daily activity. Peoples are search an alternative option to meet their energy demand They do either by introducing renewable source of energy, by hybridization different energy mixes or by optimization and increasing the efficiency of energy materials and equipment’s. Besides these methods peoples are started recovering the waste heat to generate power for different purposes. A model example of countries which are successfully produced power from waste of cement plants as indicated in [1] are India, China and South-east Asian countries

Objectives
Methods
Findings
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call