Abstract

The objective of this work has been to analyze the variation of different economic parameters (Levelized Cost Of Energy and Internal Rate of Return) for two possible ways of manufacturing: production by project to mass production. For this, 6 possible scenarios have been considered, taking into account the number of equipment manufactured and the economic parameters have been calculated in order to know which alternative provides greater economic viability, thus making the project more profitable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.