Abstract
The article presents issues related to the reconstruction of the road bridge in the village Żórawina. An existing bridge was replaced by a new soil-steel structure. The adopted solutions, which fulfill the guidelines of conservator’s protection, allowed making aesthetic and simultaneously economically efficient bridge structure. The time needed to carry out the investment was also a very important factor in determining the final design solutions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.