Abstract
1. The tunnel for diversion of the Angren River, constructed in 1971 for the first stage of operation, was designed in accordance with the then existing instructions [3]. 2. Publication of the new Instructions on the Design of Hydraulic Tunnels [5] made it possible to eliminate construction of the reinforced gunite ring planned for the second stage of construction, which saved 500,000 rubles. 3. The design of a similar pressure tunnel according to the new instructions [5] would save more than 1,300,000 rubles due to a reduction in the lining thickness and weigh of reinforcement, and the use of lightweight timbering of sprayed concrete and anchors instead of a protective roof.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.