Abstract

ABSTRACTIn 1985 the House of Commons Environment Committee expressed reservations over some of the waste‐management procedures followed by British Nuclear Fuels Ltd at their Drigg low‐level radioactive waste disposal facility near Sellafield in Cumbria. These reservations prompted the company to implement a £20 million programme of improvements aimed at maximizing site usage, reducing trench leachate arisings and redirecting to the Irish Sea.This paper provides information and test results associated with design considerations and initial dilution testing, respectively, of a computercontrolled long sea outfall system designed to discharge leachate to the Irish Sea. Information is also provided on difficulties experienced during construction of the outfall.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.