Abstract
The road is one of the traffic infrastructures for driving which supports all community activities. One of the stages of road construction is land clearing, in which one of the activities is eviction or excavation. The road construction location is the Trans Papua Wasior-Nabire road, Yamor District, Kaimana Regency, West Papua Province. However, the problem in this study is whether the excavation method is suitable for excavating material for road construction. Based on these problems, the purpose of this study is to recommend a method of excavation on the Trans Papua Wasior-Nabire road section. The method used is the Pettifer and Fookes (1994) criterion approach to determine the capability method. The results obtained with this approach indicate that the KM 501+500 excavation site is included in the level of easy digging capability or enters into a condition that is easy to dig. At the KM 502+100 excavation site, it is included in the hard digging capability level or a category that is difficult to dig because of the condition of the material which is difficult to dig, so the recommendation given is to use heavy equipment, namely a hydraulic excavator (backhoe) or a power shovel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.