Abstract
The current status and recent developments on the muon non-scaling FFAG for the Neutrino Factory studied in the framework of the EUROnu/IDS-NF projects are presented. Beam dynamics studies, including the process of acceleration, are discussed. A first pass at engineering for the layout of the ring cell is described. Progress of studies on the main machine subsystems is discussed. The future plans for the study are described.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have