Abstract
The excavation-induced stress relief and inward movement of the retaining wall will result in soil rebound deformation at the bottom of the excavation, adversely affecting nearby existing tunnels and foundation piles. Various existing methods for calculating the excavation rebound rely on rebound parameters and void ratio obtained from laboratory tests, with considering the effects of sampling, specimen preparation and laboratory procedures on the rebound parameters. As a result, a novel method is proposed in this article for calculating excavation rebound based on rebound-recompression method (RRM). This method first modifies initial void ratio (e0) and laboratory recompression index (CLR) used in traditional methods (TM) for calculation, based on field rebound and recompression curve proposed by the RRM, to in situ void ratio (ev0) and field recompression index (CFR). Then, the final rebound at the bottom of the excavation is calculated using a layered summation method. In addition, through two engineering examples, the proposed method is compared with existing calculation methods and measurements, demonstrating that this method is easy of calculate, yields reliable results, and can accurately predict the final soil rebound at the bottom of the excavation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.