Abstract

The research aimed to study the causes and difficulties that beset the process of executing construction projects, by studying the provisions of the standard contracting contract FIDIC, which is used by the Ministry of Public Works and other public institutions in Jordan, whether the fourth edition of it or the 99th edition, noting that the unified contracting contract book for the year 1996 is It is only the FIDIC contract with its fourth edition and its amendments. Also, this study aims to clarify the causes and these difficulties and to indicate the solutions that can be proposed to avoid these difficulties. The study recommended the following:

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.