Abstract

This paper evaluates the effect of making a subjective decision in a design for assembly time analysis. An example is found in the first set of questions for estimating handling time of a part the user chose “parts are easy to grasp and manipulate” as opposed to “parts present handling difficulties”. The subjectivity is explored through a study of assembly time estimates generated by a class of mechanical engineering students in the time analysis of a clicker pen based on the Boothroyd and Dewhurst estimation method. The assembly times calculated by the class ranged from a minimum of 23.64 seconds to a maximum of 44.89 seconds (range of 21.25 seconds). This large range in results serves as motivation in determining the effect that answering a subjective decision has on the resulting assembly time estimate. Initial results indicate that not answering the first level of subjective questions will result in assembly time estimate within 15% of the time had the subjective question been answered. The probability density plots of the time estimates also indicates that 63% of the time, the estimated assembly time without making the subjective decision will fall within the normal distribution had the subjective decision been made. This provides evidence that there is an opportunity to reduce the amount of subjective questions that a user must answer to estimate the assembly time of a product.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.