Abstract

With the rapid development of agile Earth observation satellites (AEOSs), these satellites are able to conduct more high-quality observation missions. Nevertheless, while completing these missions takes up more data transmission and electrical energy resources, it also increases the coupling within each satellite subsystem. To address this problem, we propose a reasoning-based scheduling method for an AEOS under multiple subsystem constraints. First, we defined the AEOS mission scheduling model with multi-subsystem constraints. Second, we put forward a state variable prediction method that reflects the different coupling states of a satellite after analyzing the coupling relationships between various subsystems and identifying the primary limiting coupling states for each subsystem. Third, we established the reasoning rules corresponding to the planning strategies of different coupling states of the satellite by adding two planning strategies based on the planning strategies of existing planning methods. By comparing the proposed method to three heuristic scheduling methods and a meta-heuristic scheduling method, the results show that our method has better performance in terms of scheduling results and efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.