Abstract
When the scaffold construction method is applied on long-span steel trussed arch bridges, reasonable setting of the temporary pier elevation has significant influence on assembly linearis and safety assembly of long-span steel trussed arch bridges with semi-cantilever. In this paper, in accordance with the manufacturing linearis steel trussed beam bridge and steel truss beam linearis changing during building process, the calculation of temporary pier elevation was studied systematically, and practical function was deduced. Then, the method was applied to a long-span steel trussed arch bridge. The obtained result by in-situ assembly and dismantling presents that: 50 mm preserved method is considered in this paper, which can provide convenience for removing the temporary pier. At the same time, the rationality and reliability of the presented approach are verified. It also can provide reference for similar bridge construction.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.