Abstract
Abstract The number of zones during multi-stage hydraulic fracturing (MSHF) is increased. There have been cases of MSHF with 10 zones. Therefore, along with such important parameters as number of fractures, fracture length, fracture conductivity there is one more important parameter - the order of placing zones in operation in horizontal wells with MSHF. In this paper, the production of multi-stage hydraulic fracturing wells of one JSC Gazpromneft-NNG oilfield is analyzed and necessary calculations are made which allow to substantiate the placing zones in operation of MSHF well gradually from the bottom to the heel, with carrying out the refracturing the previous zone at the transition to next. Both the cumulative production in case of simultaneous and in case of gradually placing zones in operation is made, and the economic evaluation is carried out.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.