Abstract

This study aimed at reanalysis of measurement scale of PM leadership pattern. The measurement of PM leadership was conducted by distributing a questionnaire to subordinates, asking them to rate their leaders. Subjects were 400 subordinates. Regarding questionnaire item to P (Performance) and M (Maintenanace) scale, we prepared two factors comprising 24 items. First, we conducted them normal varimax method, secondly group principal method for testing an independency of each scale.Results were as follows: (1) There were three factors: Factor 1… group maintenance function, Factor 2… pressure factor of the performance function, Factor 3… planning factor of the performance function. (2) We proposed PM scale based on eight each of the Pand M items respectively, because correlation between P and M scale was r=. 184.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.