Abstract

This paper presents research results within real-time production optimization and reservoir management at the Center for Integrated Operations in the Petroleum Industry (IO center). This includes life-cycle and long term issues like well location and target production rates. Further, results on short term production optimization, for instance the allocation of target production between wells and routing of wells into pipelines, will be presented. Finally, results on value chain optimization, where the production chain from reservoir to export is modelled, are reviewed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.