Abstract

There are more large-scale photovoltaic (PV) plants being established in rural areas due to availability of low-priced land. However, distribution grids in such areas traditionally have feeders with low X/R ratios, which makes the independent reactive power compensation method less effective on voltage regulation. Consequently, upstream step voltage regulator (SVR) may suffer from excessive tap operations with PV-induced fast voltage fluctuations. Although a battery energy storage system (BESS) can successfully smooth PV generation, frequent charge/discharge will substantially affect its cost effectiveness. In this paper, a real-time method is designed to coordinate PV inverters and BESS for voltage regulation. To keep up with fast fluctuations of PV power, this method will be executed in each 5 s control cycle. In addition, charging/discharging power of BESS is adaptively retuned by an active adjustment method in order to avoid BESS premature energy exhaustion in a long run. Finally, through a voltage margin control scheme, the upstream SVR and downstream PV inverters and BESS are coordinated for voltage regulation without any communication. This research is validated via a real-time digital simulator MatLab cosimulation platform, and it will provide valuable insights and applicable strategies to both utilities and PV owners for large-scale PV farm integration into rural networks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.