Abstract

Horizontal/interregional eco-compensation is an important policy to promote regional ecological and environmental cooperation and realize sustainable development for river basins. To solve these problems, a horizontal compensation framework based on integrated water rights (IWRs) transaction has been established. Taking the Yellow River basin as an example, the IWRs scheme realizes sustainable development, to a certain extent, improving the current issues of shortages, the low utilization efficiency of water resources, and weak water environmental carrying capacity. Evidence for this improvement includes: (1) an increased revenue of USD 244.71; (2) the water use efficiency in the middle and upper streams (Qinghai, Gansu, Ningxia, Neimenggu, Shanxi) and the overall river basin being obviously improved (the maximum improvement value is 0.1273 m3/USD); (3) the overload situation of water resource carrying status being relieved in some subareas (Ningxia, Neimenggu, Henan, Shandong) and improved in the whole basin (from 0.6366 to 0.6124); (3) the water environmental carrying rate (COD and NH4+-N) of the middle and upper streams (Qinghai, Gansu, Ningxia, Neimenggu, Shanxi) and the whole river basin obviously decreasing (with maximum decreasing values of 0.43 and 1.14, respectively).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call