Abstract

It is important and difficult to control the temperature of mass concrete structure during high arch dam construction. A new method with decision support system is presented for temperature control and crack prevention. It is a database system with functions of data storage, information inquiry, data analysis, early warning and resource sharing. Monitoring information during construction can be digitized via this system, and the intelligent analysis and dynamic control of concrete temperature can be conducted. This method has been applied in the construction of the Dagangshan Arch Dam in China and has proven to be very convenient. Based on the decision support of this system and the dynamic adjustment of construction measures, the concrete temperature of this project is well-controlled.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.