Abstract

AbstractThe photovoltaic (PV) power output might be frequently curtailed to maintain electricity supply‐demand balance in future power systems. In our previous study, we proposed a new method for updating the battery energy storage system (BESS) charge/discharge and the generator unit commitment (UC) schedules based on the forecasted and actual PV power outputs. The forecast dataset was updated every 3 h (eight times a day). Although the simulation results showed that the proposed method could reduce the supply‐demand imbalances, it was not clear whether the forecasted or actual values made contributions. Therefore, in this study, we propose and evaluate a real‐time scheduling and operation method using the forecasted and actual PV power outputs assuming that the forecasted dataset is updated only once a day. Numerical simulations of supply‐demand operations are conducted on the power system model of the Kanto area of Japan for one year. The results show that the previous study method has a slight advantage over proposed method in terms of curtailed PV energy and operational cost of thermal generators reduction, but the difference is very small, indicating that the contribution of the actual PV power outputs is greater than that of the forecasted PV power outputs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.