Abstract

Task scheduling is very important in real-time systems as it accomplishes the crucial goal of devising a feasible schedule of the tasks. However, the uncertainty associated with the timing constrains of the real-time tasks makes the scheduling problem difficult to formulate. This motivates the use of fuzzy numbers to model task deadlines and completion times. In this paper a method for intuitively defining smooth membership functions (MFs) for deadlines and execution times has been proposed using mixed cubic-exponential Hermite interpolation parametric curves. The effect of changes in parameterized MFs on the task schedulability and task priorities are also reported. A new technique is proposed based on the concept of dynamic slack calculation to make the existing model more practical and realistic. Examples are given to demonstrate the more satisfactory performance of the new technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.