Abstract

In this paper, a new methodology to unleash the potential of demand response (DR) in real-time is presented. Customers may tend to apply their DR potential in the real-time market in addition to their scheduled potential in the day-ahead stage. Thus, the proposed method facilitates balancing the real-time market via DR aggregators. It can be vital, once the stochastic variables of the network such as production of wind power generators do not follow the forecasted production in real-time and have some distortions. Two-stage stochastic programming is employed to schedule some DR options in both day-ahead and real-time markets. DR options in real-time are scheduled based on possible scenarios that reflect the behaviors of wind power generation and are generated through Monte-Carlo simulation method. The merits of the method are demonstrated in a 6-bus case study and in the IEEE RTS-96, which shows a notable reduction in total operation cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.