Abstract

In the paper a problem of real-time requirements meeting at PLC is presented. Basic parameters associated to real time and factors determining their value were discussed. Real-time reliability indices for PLC and methods of their estimation and experimental testing was also proposed. Results were depicted by examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.