Abstract
Abstract: Reactive power assignment has not been considered seriously in wind power because many system owners manage real power output firstly and maintain the required voltage for each wind turbine. However, renewable resources penetration is being continuously increased and power system operator might ask additional service to improve the reliability and stability issues. Owing to the system loss by the extensive area, the uncertainty of transferred power from large-scale wind farm is considerable. Counterbalancing the gap between expected and real output quantity is available with additional control design but reducing the occurred error is more effectual to not only the system efficiency but also the system stability. In this paper, a reactive power assignment strategy based on the relative distance of each wind turbine in farm, and realistic assignment processes to verify the positive effect are performed by PSCAD/EMTDC. The strategy is considering voltage fluctuation and system loss by two distinguished assignment processes that regarding array and turbines.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.