Abstract

Increased flow rates due to stormwater at the Klagshamn wastewater treatment plant occasionally cause hydraulic overloading of the activated sludge process resulting in sludge loss from the secondary clarifiers. To minimize these problems different operational strategies have been evaluated at the plant. Practical experiences have shown the benefits of using in-line storage for flow equalization even if the available volumes may seem small in comparison to the total daily flow rate during stormwater occasions. Step feed operation at the treatment plant can be used to further ease the problems with sludge loss. By-pass of primary treated wastewater can finally be used to avoid hydraulic overloading of the biological treatment process. By combining these strategies in a real time control system, the need for erecting off-line storage volumes can be minimized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.