Abstract
Abstract This paper discusses a real time bus load processing algorithm derived and implemented by Florida Power Corporation (FPC). The algorithm is used in the FPC load flow program (CEP) that executes in the energy control center computer. It calculates a bus load MW and MVAR value for each load bus modeled in CEP using relevant telemetered line flows and modified network tree processing techniques. The algorithm is reasonably fast in execution for the approximately 900 buses and 1100 lines modeled by CEP.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.