Abstract

Transmission expansion planning (TEP) is a complex problem where building a new line involves a long permitting process of around 10 years. Therefore, transmission expansion must anticipate the evolution of uncertainties, particularly those derived from changes in the capacity and location of new generating facilities. As it is not possible to request permits for all possible lines, priorities must be established. We develop a formulation to use real options valuation to evaluate the potential benefit of candidate lines and thereby identify priority projects. We present a feasible representation of optionality in TEP projects and propose a tractable evaluation of option value. The proposed technique identifies the candidate transmission lines with the highest potential, as well as their main value drivers. This is implemented in a realistic large-scale case study based on the Spanish system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.