Abstract

This study examines the viability of an iron mining mineral with the approach of real options, which allows the mining project flexibility and scalability. A positive value for the Option to delay was achieved, which indicates the feasibility of the Itakpe project. In addition, the Option to abandon before the expiration of the project under unfavorable market conditions was obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call