Abstract

This paper presents reactive tabu search for job shop scheduling problems considering energy management. Production scheduling of factories should be minimized in order to keep customer delivery time. Since reduction of energy costs is important, operational planning of energy plants in factories should be optimized as well. However, the scheduling in factories and optimization of energy plants have been solved separately so far. Although energy costs have been ignored when the scheduling is optimized, it should be considered from the management point of view. This paper tries to optimize production scheduling and operational planning of energy plant simultaneously in order to minimize maximum end time of all factory operations (makespan) and total energy costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.