Abstract

Reactive scheduling approach is considered effective in manufacturing systems, which undergoes various types of delays due to disruption such as machine breakdowns, urgent jobs and so forth. This paper deal with a problem in what situation we should conduct schedule revision under reactive scheduling to obtain an efficient revised schedule. We propose a new model for reactive scheduling based on a control limit policy idea with critical number of delayed tasks which can be a measure to determine the suitable timing of schedule revision. Some computational experiments demonstrate the effectiveness of the proposed model by applying it to job shop scheduling problems with due date.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.