Abstract

Reactive power support is critical for system security and pricing of reactive power is a vital issue in restructured environment. Peaking units at hydroelectric power plant in condenser mode operation can provide major reactive power support. Therefore costing structure for hydroelectric power plant incorporating various cost components in condenser mode operation is presented in this paper. Major cost components include capital cost component, changeover cost component and a cost component related to number of service hours in condenser mode operation. A methodology is proposed based on these components. A case study of Koyna Hydro Electric Power Plant (KHEPP) is elaborated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.