Abstract
In this chapter, two different wind park reactive power compensation strategies for the DFIG wind park connected to the sub-transmission level are proposed. Except considering DFIG wind turbines as dynamic reactive power compensator, some extra reactive compensation equipments such as capacitor banks and STATCOM are installed at the wind park substation level. The dispatch method of reactive power compensation size among capacitor banks, and DFIG wind turbines and STATCOM is studied. Finally, with DIgSILENT software, the performances of different reactive power compensation strategies in steady state are tested by simulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.