This paper addresses the problem of reactive power procurement by an independent system operator (ISO) in deregulated electricity markets. A reactive bid structure is proposed in the context of a reactive power market. Based on the reactive power price offers and technical constraints involved in reactive power planning, a two-tier approach is developed to determine the most beneficial reactive power contracts for the ISO. The reactive capability of a generator and therefore the opportunity costs in providing reactive power is also included in the model. Uncertainty in reactive demand and in reactive bids of participating parties is incorporated through Monte Carlo simulations and the expected reactive power procurement plan for the ISO is hence determined. The CIGRE 32-bus network, approximately representing the Swedish system, is used for the studies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.