Abstract

Material control schemes can be classified as push, pull, or hybrid strategies. This article compares the performance of MRP (push) and kanban (pull) for a multi-stage, multi-product manufacturing system. Using simulation experiments we analyze system performance under different product mixes and observe that in certain environments with advance demand information kanban-based pull strategies can lead to significant inefficiencies. In these environments MRP-type push strategies yield better performance in terms of inventories and service levels. We also study the impact of design parameters such as safety lead time and safety stock policies on system performance and observe that for low and medium values of system loads, safety lead time policies yield better system performance than safety stock policies. These insights can be helpful in designing efficient MRP-type push strategies in multi-product environments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.