Abstract
This paper presents a new and efficient semiprobabilistic method developed during the Bay of Fundy studies, to determine the raw tidal energy absorption capability of a power system. This method uses the annual load and tidal duration shapes, but does not require the hourly simulation of system load and tidal generation. The power system constraints on raw tidal energy absorption and the concept of must-run generation together with the modification of the annual load duration curve are also discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have