Abstract

Over the past few years, the U.S. nuclear power industry has gained substantial experience and appreciation of the technical complexity and rigor required to meet a performance-based site clean-up standard. Five large power reactors and several smaller ones are now well along the path to license termination. They have not been on this journey alone. There has been a steep learning curve for all stakeholders involved in the process including state and federal radiation regulators, legislators, and the public. We have all learned that the translation of results from a post remediation survey interpreted through pathway modeling for comparison with a dose-based clean-up standard is for many a leap of faith. Our regulator has an understandable desire to address this uncertainty by demanding conservative analysis at each turn. As a result, it is extremely demanding to demonstrate that a clean-up standard in the 0.15–0.25 mSv/a range has been met. It is not likely that a standard in the 10 μSv/a level, typically associated with radiological clearance standards, can be practically demonstrated while still meeting the current expectations of U.S. Nuclear Regulatory Commission for technical rigor.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call