Abstract
Since the 1970s Manitoba Hydro has performed 60 Hz withstand tests together with partial discharge measurements on new and salvaged bushings and current transformers rated ≤115 kV using facilities at our service centre. Similar equipment rated 230 kV, 550 kVac and 500 kVdc has been tested only under special circumstances, and as a result has experienced a higher failure rate in service. A high voltage test facility is currently under construction in Winnipeg that has been designed for full dielectric testing of equipment rated up to 550 kVac and 500 kVdc. The original intent was for testing of instrument transformers, bushings and aerial devices. The scope has been expanded to include power transformers because the avoided costs of associated forced outages are substantial.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.