Abstract

The adoption of Internet and Intranet technologies has been rapidly spreading and existing systems are being replaced with new systems based on these new technologies. At changing environment of the power system industry, in 1999 Toshiba announced a concept of new middleware for power system network control systems including energy management systems (EMS), supervisory control and data acquisition systems (SCADA), and distribution management systems (DMS). This new middleware is based on latest Internet and Intranet technologies, offering the real-time operation and high reliability required for network control systems. Several systems are being manufactured, and some of which are already at the stage of commissioning tests. This paper focuses on a SCADA system for the ultra high voltage equipment pilot plant of Tokyo Electric Power Corp. (TEPCO) which has been working since December 2000, and uses Intranet technologies, with an emphasis on a functional overview and the features of the newly developed system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.