Abstract

Roadway development rates in Australian underground coal mines are failing to keep pace with modern longwall systems and are unlikely to sustain further improvements in longwall productivity into the future unless step change improvements to roadway development equipment and practices are made. Bottlenecks which limit and constrain improved production and impact the safety of operators have been identified through a series of industry surveys, with the manual installation of strata support materials, consumables delivery, coal haulage and monorail installation being highlighted as major areas to improve development performance. This paper looks at research being carried out at the University of Wollongong in designing an integrated system approach for the fully automated handling and installing of development consumables, and the systems required to support these activities. A series of hard automation manipulation devices have been demonstrated in surface trials and the results indicate that rapid roadway development can be achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.