Abstract

To replace a two-lane bridge nearing the end of its design life, the Delaware Department of Transportation used an innovative approach. Built using geosynthetic reinforced soil abutments and prefabricated bridge superstructure elements, the composite bridge was constructed rapidly and has been equipped with a custom-designed instrumentation system to monitor long-term performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.