Abstract

The development and maturity of soft components technology provides a new idea for the reconfiguration of production control systems. In other words, according to the requirements of dynamically arriving jobs, the production control system organizes all kinds of required production resources, by recalling predefined soft components to dynamically configure the production control system, which can ensure a quick response to the changes of customers’ demands and support dynamic reconfiguration of the system structure. In this paper, a method for rapid reassignment of job shop production resources by using soft components technology is proposed. The key problems of the subject domain are investigated and an illustrative case study is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.