Abstract

With the increasing traffic volumes in European railway networks and reports on capacity deficiencies that cause reliability problems, the need for efficient disturbance management becomes evident. This paper presents a heuristic approach for railway traffic re-scheduling during disturbances and a performance evaluation for various disturbance settings using data for a large part of the Swedish railway network that currently experiences capacity deficiencies. The significance of applying certain re-scheduling objectives and their correlation with performance measures are also investigated. The analysis shows e.g. that a minimisation of accumulated delays has a tendency to delay more trains than a minimisation of total final delay or total delay costs. An experimental study of how the choice of planning horizon in the re-scheduling process affects the network on longer-term is finally presented. The results indicate that solutions which are good on longer-term can be achieved despite the use of a limited planning horizon. A 60 min long planning horizon was sufficient for the scenarios in the experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.