Abstract

Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.