Abstract
Railway infrastructure managers must deal with new operators' requests for capacity. Planning the construction of new infrastructure or rehabilitation of existing infrastructure must be carried out very carefully due to the huge investment needed. This paper examines a Constraint Programming (CP) model of the railway infrastructure saturation problem. The CP model is applied to assess the capacity of a junction or a station. Two resolution algorithms have been developed and combined to be applied to an actual case study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.