Abstract

Railways are required to operate with a high level of reliability and safety for transporting passengers within a certain budget. One important way of meeting these requirements is to implement proper maintenance activities. However, maintenance cost is always under pressure for operating company. Considering the main maintenance activities for rail, this paper discusses a model for systematic and holistic cost analysis using a Petri nets (PN) methodology. By developing sub-models including: deterioration, inspection, lubrication, maintenance and renewal, a whole model of rail maintenance process is developed based on PN. The Monte Carlo method is applied to the model to simulate the maintenance process and to evaluate the related cost. The application of the model is demonstrated by an example. The model is solved, and the maintenance cost during the rail’s life cycle is presented. The costs resulting from different maintenance activities are also simulated and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.