Abstract

Abstract The EU-DEMO First Wall (FW) will be a relatively thin structure. In order not to damage this layer, heat loads distributed onto the wall should be carefully controlled. In the case of transient events, as for example plasma disruptions, the steady-state heat load limit ( ∼ 1 - 2 M W / m 2 ) can be largely exceeded for a timespan sufficiently long to cause damages. Therefore, when the control system detects an upcoming disruption, Shattered Pellet Injection (SPI) or Massive Gas Injection (MGI) mitigation techniques can be employed to inject impurities and switch off the plasma safely. In the present work, the Monte-Carlo ray-tracing code CHERAB is used to compute the radiative heat load distribution on the EU-DEMO Plasma Facing Components (PFCs) due to a mitigated plasma disruption. By applying ad-hoc techniques to improve the quality of the Monte Carlo calculation, we obtain a peak radiative load of ∼ 490 M W / m 2 on the PFCs, which is ∼ 25 % lower than previous estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.